Posted on 28 September 2016

The system consists of 8 x 1650 kVA Diesel Powered Rotary UPS synchronised on a common MV ring with dual redundant control installed underground at the Simmonds Street Complex.

Fuel is supplied via 3 x 48 000 litre underground bulk storage tanks through 2 x 23000 litre day tanks. Sound attenuation is provided to limit external sound levels to well within the council requirements. Over 28 kM of cabling was installed by DES, only 6 months were taken to complete the project with only four electrical shutdowns to integrate the system into the complex.