CKR Consulting Engineers were appointed the Electrical Consulting Engineer for the GreenStar rated top structure and Nala Consulting Engineers were appointed as Electrical Consultants for the super basement.  Aveng and Trencon, as a joint-venture, were appointed as the main contractor for the implementation of this project. 

Diesel Electric Services scope of work included 4 x 1650kVA diesel generators, 2 x 160kVA UPS's, 2 x 100kVA UPS's, 12 x 10kVA UPS's and 2 x 20 000 litre bulk diesel tanks. 


Diesel Electric Services interfaced with Malaysian Switchgear Distributors who supplied, installed and commissioned the associated medium voltage switchgear for this site. 

Legrande dry type transformers (11kV to 400V) were supplied and installed by Diesel Electric Services.